问题

● During the project, requirements change for a variety of reasons. As needs change and as work proceeds, additional requirements are derived and changes may have to be made to the existing requirements. It is essential to manage these additions and changes efficiently and effectively. To effectively analyze the impact of the changes, it is necessary that the source of each requirement is known and the rationale for any change is documented. The project manager may, however, want to track appropriate measures of requirements volatility to judge whether new or revised (75)are necessary.

(75)

A. proceedings

B. controls

C. forecasting’s

D. prelibations

参考答案
您可能感兴趣的试题
  • ● 某企业开发应用程序,要求调用传输层的安全协议保障应用通信的安全,下面可选的传输层安全协议是 (6) 。(6)A. IPsecB. L2TPC. TLSD. PPTP
  • ● 在异步通信中,每个字符包含1位起始位、7位数据位、1位奇偶位和2位终止位,每秒钟传送100个字符,采用4相相位调制,则有效数据速率为 (7) 。(7)A. 500b/sB. 700b/sC. 77
  • ● 关于网络工程需求分析的论述,正确的是 (8) 。(8)A. 任何网络都不可能是一个能够满足各项功能需求的“万能网”B. 必须采用最先进的网络设备,获得最高的网络性能C. 网络需求分析独立于应用系统
  • ● 对于校园网来说, (9) 。(9)A. 其核心是网络环境,利用网络的人是关键B. 其核心是应用,网络教学资源是根本C. 网络基础平台是否先进是评价校园网成功与否的重要指标D. 校园网视其地域的大小
  • ● 为维护软件开发者的合法权益,解决自动保护可能产生的权属纠纷,我国实行了 (10) 。(10)A. 计算机软件著作权登记制度B. 计算机软件标记制度C. 计算机软件商标制度D. 计算机软件产权审查制
  • ● 某用户为其信息化建设公开招标,有 A、B、C、D 四家有资质的软件公司投标。C 公司与该用户达成协议,将标的从48万元压到28万元。A、B、D三家投标书中投标价均为40万元以上,只有C公司为30万
相关内容